-- card: 66872 from stack: in -- bmap block id: 0 -- flags: 0000 -- background id: 3633 -- name: Work Loads -- part 25 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=238 top=104 right=133 bottom=460 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: textField1 -- part 26 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=238 top=169 right=197 bottom=460 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: textField1 -- part 27 (field) -- low flags: 01 -- high flags: 0002 -- rect: left=409 top=260 right=275 bottom=464 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: pagexofy -- part 28 (button) -- low flags: 00 -- high flags: A003 -- rect: left=247 top=215 right=235 bottom=437 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: Resource Histogram ----- HyperTalk script ----- on mouseUp go card id 85241 end mouseUp -- part contents for background part 6 ----- text ----- The total work load is the amount of work allocated to a resource for a given period of elapsed time. The Resource Histogram shows the work load for a resource you specify. To calculate a resource’s work load, MacProject II looks at each task to which the resource is assigned. MacProject II considers the resource to be allocated during the spans of time covered by its resource durations, plus any nonworking time in the interim, such as weekends. If two resource durations overlap, they both count for the period in which they overlap. -- part contents for background part 7 ----- text ----- If Calculate Using Planned is on in the Dates menu, one task’s effect on a resource’s work load is: If Calculate Using Actual is on, one task’s effect is -- part contents for background part 27 ----- text ----- Calculations -- part contents for background part 28 ----- text ----- Work Loads -- part contents for card part 25 ----- text ----- (Earliest Start + resource duration) x (% effort x number ) -- part contents for card part 26 ----- text ----- (Actual Start + resource duration) x (% effort x number) -- part contents for card part 27 ----- text ----- 1 of 2